CURRENT ORDER PROCESSING TIMEHamburg1hBremerhaven2hWilhelmshaven2hRotterdam2hAmsterdam2hAntwerpia1hZeebrugge1h
Ports / MRN Closure

MRN Closure Bremerhaven — BHT and ATLAS Systems

Updated: March 2026Reading time: ~7 min

Bremerhaven is Europe's fourth-largest container port and the continent's biggest vehicle terminal. It is particularly important for the automotive industry and container exporters. The port handles approximately 4.9 million TEU annually (2025 data). If your MRN was not closed after export through Bremerhaven — we help resolve the issue.

BHT System — How Does It Work?

BHT (Bremer Hafentelematik / Bremen Harbour Telematics) is the information system operated by dbh Logistics IT AG, active since the mid-1980s as the central PCS for ports in Bremen, Bremerhaven, and Cuxhaven. For a complete guide on the BHT Number registration process, see our article on BHT Number (BHT-Referenznummer) — Export Registration in Bremerhaven.

Key system components:

  • BHT Export Port Order — export port order registered in the BHT system
  • CODIS — cargo data system for container terminals (mandatory since 2008)
  • BIT (Business Information & Tracking) — shipment information and tracking system
  • DAKOSY GE — joint DAKOSY and dbh platform for submitting BHT Export Port Orders
  • ATLAS-AES — Germany's customs system (same as Hamburg)

BHT sends cargo presentation confirmations to ATLAS, which processes the data and returns feedback. The competent customs office is Hauptzollamt Bremen.

MRN Closure Procedure in Bremerhaven

  1. Export declaration in ATLAS — Ausfuhranmeldung is submitted and the MRN is assigned
  2. Export Port Order in BHT — a port order is registered in the BHT system
  3. Container delivery to terminal — the container is accepted at the designated terminal
  4. Cargo presentation confirmed — BHT transmits confirmation to ATLAS (IE507)
  5. Vessel loading — IE590 is generated automatically after loading
  6. IE518 — results are sent to the Polish customs office of export
  7. IE599/CC599C — export confirmation is issued by the AES/ECS2 PLUS system
Sounds complex? You don't need to know these systems — contact us and we'll take care of the entire process.

Why MRN May Not Be Closed in Bremerhaven

  • Coordination issues between DAKOSY GE and BHT — two systems can generate discrepancies
  • Different procedures at different terminals — Eurogate, NTB, and MSC Gate have different internal processes
  • Container transhipped to another vessel — common in Bremerhaven due to its hub function
  • Missing or incorrect Export Port Order in BHT
  • Container delivery timing — early deliveries may have booking linkage issues
  • ATLAS communication problems with the Polish customs system

How We Help

  1. Diagnostics — verification of Export Port Order status in BHT and MRN status in ATLAS
  2. Contact with Hauptzollamt Bremen and dbh Support
  3. Evidence collection — loading confirmation from Eurogate/NTB/MSC Gate terminal, manifest, B/L
  4. Coordination with Polish customs — enquiry procedure (Art. 335 UCC-IA)
  5. Obtaining IE599/CC599C

What We Need From You

  • MRN of the export declaration
  • Export Port Order or booking number
  • Container number, seal data, weight
  • Bill of Lading (B/L)
  • Exporter's EORI number
  • Terminal name in Bremerhaven

Key Terminals in Bremerhaven

  • Eurogate Container Terminal Bremerhaven
  • NTB (North Sea Terminal Bremerhaven)
  • MSC Gate Bremerhaven
  • BLG AutoTerminal

Frequently Asked Questions

Are Bremerhaven and Bremen the same port?

No, but they are served by the same BHT system and the same customs office (Hauptzollamt Bremen). Bremerhaven is a deep-water port with container and vehicle terminals. Bremen (Neustadter Hafen) handles smaller vessels.

I export vehicles via BLG AutoTerminal. Is the procedure the same?

The MRN closure customs procedure is the same. The difference is the terminal type (ro-ro instead of container) and the format of transport documents. We also handle MRN closures for vehicle exports.

How long does MRN closure in Bremerhaven take?

Typically 2–5 business days. With our intervention — 2 to 6 weeks.

Useful Articles

Close Your MRN in Bremerhaven — Contact Us

Email: kontakt@potwierdz-wywoz.pl

See also: Hamburg — DAKOSY | Wilhelmshaven — WHT

Need help closing MRN in Bremerhaven?
Contact us — we will handle your case.
Submit filing →
Legal notice:The information in this article is for general informational purposes only. It does not constitute legal or customs advice. For individual matters, we recommend consulting a licensed customs agent.